Testimonial from Electrical Distribution Solutions Ltd
Electric air circuit breakers are present in all major electric installations throughout the country, the traditional method for their replacement requires the power to be disconnected and takes in excess of 8 hours per breaker.
Electrical Distribution Solutions devised a concept for a retrofit replacement option taking less than 1 hour on site, without the need for power disconnection.
Me.so.tec Ltd  were  engaged to design from initial concept into production stage, of the  key mechanical construction housing the  electronic breaker assembly.
                      Working from site measurements  Me.so.tec Ltd  produced a working demo and developed the  concept into detailed production drawings, enabling detailed and precise  specifying and ordering of components.
                      This retrofit solution, the only one of its kind on the  market , has been installed in over a 100 applications throughout the UK for  clients including, Abbey National, British Library, Diageo, Kraft, Lafarge and  Nestle. 
                      The design and quality of the design and its precision  construction are key elements in the success of this product.
                      